Bobcat Athletic Complex...Construction

Discuss anything and everything relating to Bobcat Football here.

Moderators: rtb, kmax, SonomaCat

Post Reply
User avatar
grizzh8r
Golden Bobcat
Posts: 6905
Joined: Sat Feb 19, 2005 11:23 pm
Location: Billings via Livingston

Re: Bobcat Athletic Complex...Construction

Post by grizzh8r » Fri May 28, 2021 10:14 am

Joe Bobcat wrote:
Fri May 28, 2021 10:12 am
That walkthrough video is awesome. There is a lot of work left to go on it but I'm not going to stress about if it gets done on time. What I do stress about is how the roof edges lift up in the wind.
When looking at the stadium camera I've sometimes noticed a tall crane across campus visible behind the left side of the field house.
Does anyone know what is being built back there?
Romney gym restoration perhaps?


Eric Curry STILL makes me sad.
94VegasCat wrote:Are you for real? That is just a plain ol dumb paragraph! You just nailed every note in the Full Reetard sing-a-long choir!!!
:rofl:

Joe Bobcat
BobcatNation Hall of Famer
Posts: 3000
Joined: Sun Nov 21, 2010 4:43 pm

Re: Bobcat Athletic Complex...Construction

Post by Joe Bobcat » Fri May 28, 2021 10:56 am

grizzh8r wrote:
Fri May 28, 2021 10:14 am
Joe Bobcat wrote:
Fri May 28, 2021 10:12 am
That walkthrough video is awesome. There is a lot of work left to go on it but I'm not going to stress about if it gets done on time. What I do stress about is how the roof edges lift up in the wind.
When looking at the stadium camera I've sometimes noticed a tall crane across campus visible behind the left side of the field house.
Does anyone know what is being built back there?
Romney gym restoration perhaps?
Romney is way off to the right of the view so I don't think that's what that crane is for.


If you're looking for someone with a little authority, I'm your man. I have as little as anyone!

fsburr1
BobcatNation Redshirt
Posts: 77
Joined: Mon Apr 01, 2013 9:52 am

Re: Bobcat Athletic Complex...Construction

Post by fsburr1 » Fri May 28, 2021 1:08 pm

Roof edges will be permanently secured after the siding is installed in order to secure a watertight fit.



Joe Bobcat
BobcatNation Hall of Famer
Posts: 3000
Joined: Sun Nov 21, 2010 4:43 pm

Re: Bobcat Athletic Complex...Construction

Post by Joe Bobcat » Fri May 28, 2021 1:15 pm

fsburr1 wrote:
Fri May 28, 2021 1:08 pm
Roof edges will be permanently secured after the siding is installed in order to secure a watertight fit.
Yeah it just bothers me to see so much of the windward side of the roof lifting up when the wind picks up. Not sure they would get away with that in my neck of the woods, blowing 40 mph today with gusts up to 48.


If you're looking for someone with a little authority, I'm your man. I have as little as anyone!

User avatar
vike_king
BobcatNation Hall of Famer
Posts: 3167
Joined: Fri Oct 07, 2005 12:51 pm
Location: Helena, MT/Chester, MT/Fort Benton, MT

Re: Bobcat Athletic Complex...Construction

Post by vike_king » Fri May 28, 2021 2:26 pm

grizzh8r wrote:
Fri May 28, 2021 10:14 am
Joe Bobcat wrote:
Fri May 28, 2021 10:12 am
That walkthrough video is awesome. There is a lot of work left to go on it but I'm not going to stress about if it gets done on time. What I do stress about is how the roof edges lift up in the wind.
When looking at the stadium camera I've sometimes noticed a tall crane across campus visible behind the left side of the field house.
Does anyone know what is being built back there?
Romney gym restoration perhaps?
The crane looks to be west of Romney.....like over by the film/tv building. Maybe it was just parked there till needed???


Chester, MT/ Helena, MT

User avatar
AFCAT
Golden Bobcat
Posts: 9334
Joined: Mon Sep 12, 2016 3:25 pm

Re: Bobcat Athletic Complex...Construction

Post by AFCAT » Fri May 28, 2021 2:54 pm

Just some screen captures of what the BAC is supposed to look like versus what it looks like now.


Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image

Image


QB Club https://www.msubqc.org
Bobcat Collective https://linktr.ee/thebobcatcollective
“In the military, they teach you the best time to attack your enemy is nighttime and bad weather. We’ve got f—ing both!” — Devin Slaughter

User avatar
coachouert
Golden Bobcat
Posts: 4120
Joined: Thu Jun 02, 2005 6:49 am
Location: Bozeman

Re: Bobcat Athletic Complex...Construction

Post by coachouert » Fri May 28, 2021 3:40 pm

vike_king wrote:
Fri May 28, 2021 2:26 pm
grizzh8r wrote:
Fri May 28, 2021 10:14 am
Joe Bobcat wrote:
Fri May 28, 2021 10:12 am
That walkthrough video is awesome. There is a lot of work left to go on it but I'm not going to stress about if it gets done on time. What I do stress about is how the roof edges lift up in the wind.
When looking at the stadium camera I've sometimes noticed a tall crane across campus visible behind the left side of the field house.
Does anyone know what is being built back there?
Romney gym restoration perhaps?
The crane looks to be west of Romney.....like over by the film/tv building. Maybe it was just parked there till needed???
They are doing work on part of the fieldhouse roof (not the dome, but the lower portions of the building I believe). Crane is stationed near the four way stop by Alumni.


Cat_stache_fever listens to Nickelback...and enjoys it.

Image

Joe Bobcat
BobcatNation Hall of Famer
Posts: 3000
Joined: Sun Nov 21, 2010 4:43 pm

Re: Bobcat Athletic Complex...Construction

Post by Joe Bobcat » Fri May 28, 2021 7:13 pm

coachouert wrote:
Fri May 28, 2021 3:40 pm
vike_king wrote:
Fri May 28, 2021 2:26 pm
grizzh8r wrote:
Fri May 28, 2021 10:14 am
Joe Bobcat wrote:
Fri May 28, 2021 10:12 am
That walkthrough video is awesome. There is a lot of work left to go on it but I'm not going to stress about if it gets done on time. What I do stress about is how the roof edges lift up in the wind.
When looking at the stadium camera I've sometimes noticed a tall crane across campus visible behind the left side of the field house.
Does anyone know what is being built back there?
Romney gym restoration perhaps?
The crane looks to be west of Romney.....like over by the film/tv building. Maybe it was just parked there till needed???
They are doing work on part of the fieldhouse roof (not the dome, but the lower portions of the building I believe). Crane is stationed near the four way stop by Alumni.
mystery solved, thanks Coachouert.


If you're looking for someone with a little authority, I'm your man. I have as little as anyone!

User avatar
bobcatozzy
2nd Team All-BobcatNation
Posts: 1236
Joined: Mon Oct 19, 2009 7:05 am

Re: Bobcat Athletic Complex...Construction

Post by bobcatozzy » Sun May 30, 2021 11:05 am



Rest In peace dad.

User avatar
The Butcher
Golden Bobcat
Posts: 4177
Joined: Thu Oct 26, 2006 8:51 am

Re: Bobcat Athletic Complex...Construction

Post by The Butcher » Tue Jun 01, 2021 11:29 am

Does anyone know who received the furnishing and weight equipment contracts?



User avatar
AFCAT
Golden Bobcat
Posts: 9334
Joined: Mon Sep 12, 2016 3:25 pm

Re: Bobcat Athletic Complex...Construction

Post by AFCAT » Tue Jun 01, 2021 4:03 pm

When you see workers doing something outside the building.
Image

Looks like they may be getting ready for some paving or concrete work.
Image


QB Club https://www.msubqc.org
Bobcat Collective https://linktr.ee/thebobcatcollective
“In the military, they teach you the best time to attack your enemy is nighttime and bad weather. We’ve got f—ing both!” — Devin Slaughter

User avatar
kennethnoisewater
BobcatNation Hall of Famer
Posts: 3639
Joined: Wed Jul 20, 2011 12:41 pm
Location: Kalispell, MT

Re: Bobcat Athletic Complex...Construction

Post by kennethnoisewater » Wed Jun 02, 2021 9:06 am

AFCAT wrote:
Tue Jun 01, 2021 4:03 pm
When you see workers doing something outside the building.
Image

Looks like they may be getting ready for some paving or concrete work.
Image
Yeah looks like they poured the concrete outside the building. Wondering how far out the concrete will go eventually? It looks like there's a step down to the field in one of the renderings. Interested to see how they tie the building together with the end of the field. I think I saw a rail in one picture which makes sense.


Image

norcal cat
BobcatNation Letterman
Posts: 219
Joined: Sun Nov 01, 2009 10:46 pm

Re: Bobcat Athletic Complex...Construction

Post by norcal cat » Wed Jun 02, 2021 9:44 am

kennethnoisewater wrote:
Wed Jun 02, 2021 9:06 am
AFCAT wrote:
Tue Jun 01, 2021 4:03 pm
When you see workers doing something outside the building.
Image

Looks like they may be getting ready for some paving or concrete work.
Image
Yeah looks like they poured the concrete outside the building. Wondering how far out the concrete will go eventually? It looks like there's a step down to the field in one of the renderings. Interested to see how they tie the building together with the end of the field. I think I saw a rail in one picture which makes sense.
When I looked at the drawings online, its a very low slope from the building to the field. There is going to be some concrete and some asphalt paving. It looks like the areas that are asphalt paved will be the areas removed when they do the north end zone and the concrete areas will remain.



User avatar
vike_king
BobcatNation Hall of Famer
Posts: 3167
Joined: Fri Oct 07, 2005 12:51 pm
Location: Helena, MT/Chester, MT/Fort Benton, MT

Re: Bobcat Athletic Complex...Construction

Post by vike_king » Wed Jun 02, 2021 10:22 am

Pardon me if this has been discussed but....

There is a crew pouring cement right now, they all are wearing fluorescent green shirts.

I noticed a non-cement pourer walking around wearing a fluorescent orange shirt.

Different jobs = Different colored shirts????

Aircraft carrier deck crews do that, I think.


Chester, MT/ Helena, MT

User avatar
coloradocat
Golden Bobcat
Posts: 4856
Joined: Sat Oct 01, 2016 8:24 pm

Re: Bobcat Athletic Complex...Construction

Post by coloradocat » Wed Jun 02, 2021 10:26 am

vike_king wrote:
Wed Jun 02, 2021 10:22 am
Pardon me if this has been discussed but....

There is a crew pouring cement right now, they all are wearing fluorescent green shirts.

I noticed a non-cement pourer walking around wearing a fluorescent orange shirt.

Different jobs = Different colored shirts????

Aircraft carrier deck crews do that, I think.
It's a non-contact shirt. :D


Eastwood, did not make it. Ball out! Recovered, by Montana State!! The Bobcats hold!!! The Bobcats hold!!!

rivercat
1st Team All-BobcatNation
Posts: 1704
Joined: Sat Oct 09, 2010 11:26 am
Location: Bozeman emigrant, Whitehall immigrant

Re: Bobcat Athletic Complex...Construction

Post by rivercat » Wed Jun 02, 2021 10:29 am

vike_king wrote:
Wed Jun 02, 2021 10:22 am
Pardon me if this has been discussed but....

There is a crew pouring cement right now, they all are wearing fluorescent green shirts.

I noticed a non-cement pourer walking around wearing a fluorescent orange shirt.

Different jobs = Different colored shirts????

Aircraft carrier deck crews do that, I think.
My guess is they work for different companies.


"...get in 21 personnel and pound people and take their souls and have fun doing that..." coach Choate

User avatar
allcat
Golden Bobcat
Posts: 8691
Joined: Mon Nov 02, 2009 5:13 pm
Location: 90 miles from Nirvana (Bobcat Stadium)

Re: Bobcat Athletic Complex...Construction

Post by allcat » Wed Jun 02, 2021 1:41 pm

vike_king wrote:
Wed Jun 02, 2021 10:22 am
Pardon me if this has been discussed but....

There is a crew pouring cement right now, they all are wearing fluorescent green shirts.

I noticed a non-cement pourer walking around wearing a fluorescent orange shirt.

Different jobs = Different colored shirts????

Aircraft carrier deck crews do that, I think.
Cement is part of concrete. You pour concrete.


Geezer. Part Bionic,. Part Iconic

User avatar
Montanabob
BobcatNation Hall of Famer
Posts: 3755
Joined: Wed Feb 22, 2012 8:29 pm
Location: Two Dot

Re: Bobcat Athletic Complex...Construction

Post by Montanabob » Wed Jun 02, 2021 4:47 pm

vike_king wrote:
Wed Jun 02, 2021 10:22 am
Pardon me if this has been discussed but....

There is a crew pouring cement right now, they all are wearing fluorescent green shirts.

I noticed a non-cement pourer walking around wearing a fluorescent orange shirt.

Different jobs = Different colored shirts????

Aircraft carrier deck crews do that, I think.
Depends on what was the cheapest safety gear at the store.


MSU fan.... U of I Graduate... They're Back

User avatar
KeepTheChange
BobcatNation Letterman
Posts: 299
Joined: Mon Oct 24, 2011 10:14 pm

Re: Bobcat Athletic Complex...Construction

Post by KeepTheChange » Wed Jun 02, 2021 6:35 pm

vike_king wrote:
Wed Jun 02, 2021 10:22 am
Pardon me if this has been discussed but....

There is a crew pouring cement right now, they all are wearing fluorescent green shirts.

I noticed a non-cement pourer walking around wearing a fluorescent orange shirt.

Different jobs = Different colored shirts????

Aircraft carrier deck crews do that, I think.
Concrete



TomCat88
Golden Bobcat
Posts: 19136
Joined: Thu Oct 23, 2008 6:16 am
Location: An endless run of moguls

Re: Bobcat Athletic Complex...Construction

Post by TomCat88 » Wed Jun 02, 2021 9:39 pm

KeepTheChange wrote:
Wed Jun 02, 2021 6:35 pm
vike_king wrote:
Wed Jun 02, 2021 10:22 am
Pardon me if this has been discussed but....

There is a crew pouring cement right now, they all are wearing fluorescent green shirts.

I noticed a non-cement pourer walking around wearing a fluorescent orange shirt.

Different jobs = Different colored shirts????

Aircraft carrier deck crews do that, I think.
Concrete
Us Beverley Hillbillies fans call it cement. SEE-ment. As in, ‘cement pond’ as they called their swimming pool.


MSU - 15 team National Champions (most recent 2021); 57 individual National Champions (most recent 2023).
toM StUber