Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
How much work can be done during winter months? Any restrictions due to temperature?
Lots. I had my house built starting in January of 2018, which was the snowiest winter in Helena history, and it got done faster than the first house, which started in April 2006. Same contractor. Not a big factor. There’s always a few days when it’s just unbearable to go outside, but nothing that’s going to cause a huge, several weeks, delay.
Do concrete footings have to be done before a certain period?
My footings were poured last year on December 18th :)

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 4:11 pm
by St George
iaafan wrote:
Fri Jul 05, 2019 1:43 pm
St George wrote:
Fri Jul 05, 2019 1:37 pm
Montanabob wrote:
Fri Jul 05, 2019 12:26 pm
---The faster your concrete cures the weaker it is, don't
---need anymore roof failures.

Hope they don't make it a concrete roof unless they open a patio bar up there.
If they have any sight into the future they will design the structure and infrastructure so the future levels could be added down the road.
They shouldn’t need to add levels. They do have plans way down the road to construct an adjacent building. They also have a plan to add seating in the end zone abutting the facility.
Those extra levels could possibly feature beer sales and view of the field if they ever allow beer sales in the stadium.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 4:41 pm
by AFCAT
I saw this paragraph in the Chronicles story on the plan.

“The price tag for the first phase was originally $16 million but increased due to a planning tweak that added square footage to the project. Fundraising more at the start will ultimately cost less than trying to add extra space later on, Costello said.”

It will be interesting to see what the final design looks like.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 5:11 pm
by AFCAT

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 6:25 pm
by luckyirishguy25
Montanabob wrote:
Fri Jul 05, 2019 12:26 pm
---The faster your concrete cures the weaker it is, don't
---need anymore roof failures.

Hope they don't make it a concrete roof unless they open a patio bar up there.
Your foundation holds up the entire structure genius.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 7:13 pm
by 91catAlum
Just thought I'd add this. My brother does concrete for a living (for homes, not football stadiums). He says you can do concrete in the winter but it costs more because you need to heat the ground beforehand and for a while after the concrete is poured. Perhaps that's figured into the $18M cost, who knows.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 10:31 am
by TomCat88
Currently over $13.5 million has been privately donated to the facility. Has there ever been a sports-related facility in Montana that has received this much private financial support? It’s very cool that MSU student fees aren’t being raised for any of this. I don’t believe they were raised on the 2010 EZ project either.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 10:34 am
by St George
A little more than my two cents. Until the final design is complete and the project is either bid or negotiated they won't know the price. Final price can be greatly affected by contractor and labor availability. Contractors are not really starving for work these days. Weather can also affect the price (heating the ground for concrete would be just the start, tenting, temporary heat, workers are also slowed down due to the colder temperatures). As for the concrete, there are many different concrete designs (formulas). These designs will include other requirements such as slump, temperature of the concrete (they add ice to concrete in extreme hot weather and mix the concrete with hot water in colder weather) and air content in the concrete (air content is critical in concrete exposed to the elements). There are also additives used in the industry such as plasticizers and accelerators. Altho I'm retired now I was certified as a Concrete Inspector by the American Concrete Institute ACI and have inspected Concrete and Concrete placement in Montana, Idaho, Wyoming as well as Northern Sweden above the Arctic Circle.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 10:59 am
by Hawks86
The budget is what it is. If they want to start this winter, they'll adjust the plans accordingly.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 11:21 am
by TomCat88
Contractors were used to estimate the price. MSU also has very good, qualified facilities personnel. They’ve constructed several new buildings in the past five years, so they have good experience with every step of this type of project. Contractors, especially those around Bozeman that are MSU grads, are going to make fair bids. It won’t be difficult to find a good contractor.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 11:26 am
by TomCat88
Jabs Hall, Asbjornsen Hall, student housing, Native American Center, parking garage, re-roofing PE Center, Fieldhouse and probably more just recently. I have complete faith.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 3:46 pm
by wbtfg
TomCat88 wrote:
Sat Jul 06, 2019 11:26 am
Jabs Hall, Asbjornsen Hall, student housing, Native American Center, parking garage, re-roofing PE Center, Fieldhouse and probably more just recently. I have complete faith.
Multiple new dorms. New cafeteria.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 6:51 pm
by Long Time Cat
St George wrote:
Sat Jul 06, 2019 10:34 am
A little more than my two cents. Until the final design is complete and the project is either bid or negotiated they won't know the price. Final price can be greatly affected by contractor and labor availability. Contractors are not really starving for work these days. Weather can also affect the price (heating the ground for concrete would be just the start, tenting, temporary heat, workers are also slowed down due to the colder temperatures). As for the concrete, there are many different concrete designs (formulas). These designs will include other requirements such as slump, temperature of the concrete (they add ice to concrete in extreme hot weather and mix the concrete with hot water in colder weather) and air content in the concrete (air content is critical in concrete exposed to the elements). There are also additives used in the industry such as plasticizers and accelerators. Altho I'm retired now I was certified as a Concrete Inspector by the American Concrete Institute ACI and have inspected Concrete and Concrete placement in Montana, Idaho, Wyoming as well as Northern Sweden above the Arctic Circle.
I think we can ignore St. George he is clearly too qualified for this board. 😂😂 Pure speculation is always more entertaining.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 7:03 pm
by TomCat88
Long Time Cat wrote:
Sat Jul 06, 2019 6:51 pm
St George wrote:
Sat Jul 06, 2019 10:34 am
A little more than my two cents. Until the final design is complete and the project is either bid or negotiated they won't know the price. Final price can be greatly affected by contractor and labor availability. Contractors are not really starving for work these days. Weather can also affect the price (heating the ground for concrete would be just the start, tenting, temporary heat, workers are also slowed down due to the colder temperatures). As for the concrete, there are many different concrete designs (formulas). These designs will include other requirements such as slump, temperature of the concrete (they add ice to concrete in extreme hot weather and mix the concrete with hot water in colder weather) and air content in the concrete (air content is critical in concrete exposed to the elements). There are also additives used in the industry such as plasticizers and accelerators. Altho I'm retired now I was certified as a Concrete Inspector by the American Concrete Institute ACI and have inspected Concrete and Concrete placement in Montana, Idaho, Wyoming as well as Northern Sweden above the Arctic Circle.
I think we can ignore St. George he is clearly too qualified for this board. 😂😂 Pure speculation is always more entertaining.
Feline AIDS is the no. 1 killer of domestic cats.

It must be fun having a job at a theme park. Except for being under the constant threat of a terrorist attack.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 9:26 pm
by GoCats18
Starting to think people on here know more about concrete and building stuff then they do about what it takes to be a starting QB. Give it up people. Let the contractors and QB’s worry about their jobs.

Re: Facilities - Coach Choate

Posted: Sat Jul 06, 2019 10:14 pm
by St George
GoCats18 wrote:
Sat Jul 06, 2019 9:26 pm
Starting to think people on here know more about concrete and building stuff then they do about what it takes to be a starting QB. Give it up people. Let the contractors and QB’s worry about their jobs.
The title of the thread is Facilities and I did graduate in Engineering. I don't claim to know much about the quarterbacks and I don't comment much on them either. It is summer and this thread gives us something to discuss.

Re: Facilities - Coach Choate

Posted: Tue Jul 09, 2019 6:41 pm
by AFCAT
Just got an e-mail from the Alumni foundation with this artist's conception on the new training facility. Looks a bit different from the images we had been looking at before.

Image

Re: Facilities - Coach Choate

Posted: Tue Jul 09, 2019 8:37 pm
by TomCat88
AFCAT wrote:
Tue Jul 09, 2019 6:41 pm
Just got an e-mail from the Alumni foundation with this artist's conception on the new training facility. Looks a bit different from the images we had been looking at before.

Image
I’m not sure that’s what it’ll look like, but it’s going to have great curb appeal. It’ll be the best looking exterior on a sports facility in Montana. Huge for recruiting.

Re: Facilities - Coach Choate

Posted: Tue Jul 09, 2019 9:14 pm
by Brad_CAT
TomCat88 wrote:
Tue Jul 09, 2019 8:37 pm
AFCAT wrote:
Tue Jul 09, 2019 6:41 pm
Just got an e-mail from the Alumni foundation with this artist's conception on the new training facility. Looks a bit different from the images we had been looking at before.

Image
I’m not sure that’s what it’ll look like, but it’s going to have great curb appeal. It’ll be the best looking exterior on a sports facility in Montana. Huge for recruiting.
It’s going to be sweet trust me... :wink:

Re: Facilities - Coach Choate

Posted: Tue Jul 09, 2019 9:44 pm
by St George
Brad_CAT wrote:
Tue Jul 09, 2019 9:14 pm
TomCat88 wrote:
Tue Jul 09, 2019 8:37 pm
AFCAT wrote:
Tue Jul 09, 2019 6:41 pm
Just got an e-mail from the Alumni foundation with this artist's conception on the new training facility. Looks a bit different from the images we had been looking at before.

Image
I’m not sure that’s what it’ll look like, but it’s going to have great curb appeal. It’ll be the best looking exterior on a sports facility in Montana. Huge for recruiting.
It’s going to be sweet trust me... :wink:
Which Architectural firm is doing the design?