Re: Facilities - Coach Choate

Posted: Tue Jul 02, 2019 10:57 pm
by RickRund
Catfanatic84 wrote:
Tue Jul 02, 2019 6:51 pm
btribby wrote:
Tue Jul 02, 2019 7:01 am
catsrback76 wrote:
Tue Jul 02, 2019 12:23 am
MSU01 wrote:
Mon Jul 01, 2019 9:57 pm
MSU Toddler wrote:
Mon Jul 01, 2019 9:29 pm
Catsrgrood wrote:
Mon Jul 01, 2019 7:32 pm
As far as the actual building goes, does anyone know if the whole building is a part of this $18 million phase 1?

The renderings kind of look like two similar sized buildings connected by some windows. I could have sworn that when this plan first came out two years ago that it was mentioned that the second building closest to Kagy was a future expansion. But I haven’t been able to find anything about that again.

Edit: I think I answered my own question. According to this picture, the total structure in the end zone will be two separate phases.

Image
This seems to indicate that it is both buildings and the End Zone - maybe? (sort of confusing): https://msubobcats.com/documents/2017/9 ... df?id=2687
The page labeled "Phase One" on the Facilities Plan website makes it pretty clear to me that the first construction will only be the part of the structure highlighted in blue on the image you posted, as well as the renovation of the existing football offices in the Fieldhouse into the new academic center. The North End Zone seating is listed on the website as Phase 2 of the Bobcat Stadium renovation, after Phase 1 which is the replacement of the east sideline structure. I believe the pictured extension of the Athletic Complex that's closer to Kagy is probably in reference to the "future additions could include..." section of the facilities plan.

https://msubobcats.com/sports/2017/9/20 ... spx?id=352
Makes sense, but based on the labeling of the drawings I saw the two buildings were listed as 1 structure. But 18 mill seemed a little light on the cost so that makes sense to me.
I also believe its just the building that is highlighted in blue. Some of the drawings that MSU has posted of the inside of the building are really impressive.

I dont see the 320 people donating as a big issue. Im really really impressed that MSU was able to raise that kind of money that quickly. Especially after the big education fundraiser the raised something like 300 mil. The article stated that there would be a big push to get the additional 1.5 mil needed. My mind immediately jumped to the small donation drive that was used to complete the south endzone. The biggest thing I remember was you could text some number and automatically donate $10 (I cant tell you how many cell phones of griz fans I stole at cat/griz that year while they were drunk and texted that number). I believe that was a huge money maker for that final push. Im assuming we will see something similar for this. Probably announced at Gold Rush. Hopefully meet the goal sometime mid season with construction starting just before Christmas after our semifinal win.

Does anybody know how this will make the stadium look? The more I thought about it I think the videoboard will be left exactly where its at right now. That leads to another question; do the two buildings (one is our game day lockeroom) stay in place until the seating in the north endzone is completed? My thoughts are that the new BAC building would sit back enough where those two existing buildings wouldnt necessarily have to be torn down right away. Thoughts???
One additional benefit from the NEZ being enclosed....it will be louder!
It will be great if the noise shed increases 10 fold.....

Re: Facilities - Coach Choate

Posted: Tue Jul 02, 2019 11:44 pm
by Cataholic
TomCat88 wrote:
Tue Jul 02, 2019 8:31 pm
Grizaddict wrote:
Tue Jul 02, 2019 5:51 pm
Hawks86 wrote:
Tue Jul 02, 2019 4:06 pm
We are requesting up to $18,000,000 in authority, to include design and other non-construction costs.
Up to $3,000,000 will be financed by the University, which will be repaid with non-state revenues
generated by MSU Athletics. The remainder of the project, approximately $15,000,000, will be
funded from external gifts (donations) to this project.
https://mus.edu/board/meetings/2019/Jul ... -R0719.pdf
Thank you for info. So does that mean about 13.5M has been raised thus far from donors and then they need another 1.5M from public to get to 15M and then will finance 3M for a total of 18M. That’s how that seemed to read but must admit it’s confusing. Earlier reports made it sound like 16.5 have been raised already but this seems to negate that.
MSU is financing up to $3 million depending on what other donations come in. I’m not sure how much has been privately raised, but it’s north of $13.5 million (13.8?) and they’re requiring $1.5 million more. So they’d already be under the $3 million ($2.7?) in financing.

By comparison, UM went to the BOR with $9 million ($7 million of which came from a single donor) and asked for up to $5 million in financing.

https://missoulian.com/news/local/regen ... 97ea1.html

Since financing is paid off by revenues from games it’s still considered private.
And they had to use all $5 million in financing.

Re: Facilities - Coach Choate

Posted: Wed Jul 03, 2019 4:34 am
by lutecat
Caturday wrote:
Tue Jul 02, 2019 2:31 pm
Don’t forget that your donation can be pledged and paid over 5 years! 3000 people pledging $100/yr for 5 years and we’re there.
Well if that's the case $1500 over 5 years is only $21 per month. Do they bill you monthly or quarterly or what?

Re: Facilities - Coach Choate

Posted: Wed Jul 03, 2019 6:32 am
by TomCat88
Cataholic wrote:
Tue Jul 02, 2019 11:44 pm
TomCat88 wrote:
Tue Jul 02, 2019 8:31 pm
Grizaddict wrote:
Tue Jul 02, 2019 5:51 pm
Hawks86 wrote:
Tue Jul 02, 2019 4:06 pm
We are requesting up to $18,000,000 in authority, to include design and other non-construction costs.
Up to $3,000,000 will be financed by the University, which will be repaid with non-state revenues
generated by MSU Athletics. The remainder of the project, approximately $15,000,000, will be
funded from external gifts (donations) to this project.
https://mus.edu/board/meetings/2019/Jul ... -R0719.pdf
Thank you for info. So does that mean about 13.5M has been raised thus far from donors and then they need another 1.5M from public to get to 15M and then will finance 3M for a total of 18M. That’s how that seemed to read but must admit it’s confusing. Earlier reports made it sound like 16.5 have been raised already but this seems to negate that.
MSU is financing up to $3 million depending on what other donations come in. I’m not sure how much has been privately raised, but it’s north of $13.5 million (13.8?) and they’re requiring $1.5 million more. So they’d already be under the $3 million ($2.7?) in financing.

By comparison, UM went to the BOR with $9 million ($7 million of which came from a single donor) and asked for up to $5 million in financing.

https://missoulian.com/news/local/regen ... 97ea1.html

Since financing is paid off by revenues from games it’s still considered private.
And they had to use all $5 million in financing.
The article quotes that $500K of the financing had been raised. I’m sure UM and MSU went into its fundraising knowing that it could finance at least that much. I think the main thing is how much is funded by the alumni/fans. Other than the last MSU project and this one by UM I don’t have anything else to compare it to, but this current project definitely stands out compared to those two. There were a lot of naysayers during the process that either didn’t think MSU fans were capable or didn’t have a good understanding of the process. This just shows what an outstanding job the fundraisers and donors did. It’s something to be proud of in recent, relative terms. At the end of the day MSU donors will have put up at least $15.3 (probably closer to $17) million up front. I know of no other athletics project in the MUS that raised that much.

Re: Facilities - Coach Choate

Posted: Wed Jul 03, 2019 6:40 am
by Catfanatic84
TomCat88 wrote:
Wed Jul 03, 2019 6:32 am
Cataholic wrote:
Tue Jul 02, 2019 11:44 pm
TomCat88 wrote:
Tue Jul 02, 2019 8:31 pm
Grizaddict wrote:
Tue Jul 02, 2019 5:51 pm
Hawks86 wrote:
Tue Jul 02, 2019 4:06 pm
We are requesting up to $18,000,000 in authority, to include design and other non-construction costs.
Up to $3,000,000 will be financed by the University, which will be repaid with non-state revenues
generated by MSU Athletics. The remainder of the project, approximately $15,000,000, will be
funded from external gifts (donations) to this project.
https://mus.edu/board/meetings/2019/Jul ... -R0719.pdf
Thank you for info. So does that mean about 13.5M has been raised thus far from donors and then they need another 1.5M from public to get to 15M and then will finance 3M for a total of 18M. That’s how that seemed to read but must admit it’s confusing. Earlier reports made it sound like 16.5 have been raised already but this seems to negate that.
MSU is financing up to $3 million depending on what other donations come in. I’m not sure how much has been privately raised, but it’s north of $13.5 million (13.8?) and they’re requiring $1.5 million more. So they’d already be under the $3 million ($2.7?) in financing.

By comparison, UM went to the BOR with $9 million ($7 million of which came from a single donor) and asked for up to $5 million in financing.

https://missoulian.com/news/local/regen ... 97ea1.html

Since financing is paid off by revenues from games it’s still considered private.
And they had to use all $5 million in financing.
The article quotes that $500K of the financing had been raised. I’m sure UM and MSU went into its fundraising knowing that it could finance at least that much. I think the main thing is how much is funded by the alumni/fans. Other than the last MSU project and this one by UM I don’t have anything else to compare it to, but this current project definitely stands out compared to those two. There were a lot of naysayers during the process that either didn’t think MSU fans were capable or didn’t have a good understanding of the process. This just shows what an outstanding job the fundraisers and donors did. It’s something to be proud of in recent, relative terms.
Agreed....I am hopeful that once we close this $1.5m gap, the giving will continue, so we can get that indoor practice facility built.

Re: Facilities - Coach Choate

Posted: Wed Jul 03, 2019 8:17 am
by iaafan
Catfanatic84 wrote:
Wed Jul 03, 2019 6:40 am
TomCat88 wrote:
Wed Jul 03, 2019 6:32 am
Cataholic wrote:
Tue Jul 02, 2019 11:44 pm
TomCat88 wrote:
Tue Jul 02, 2019 8:31 pm
Grizaddict wrote:
Tue Jul 02, 2019 5:51 pm
Hawks86 wrote:
Tue Jul 02, 2019 4:06 pm
We are requesting up to $18,000,000 in authority, to include design and other non-construction costs.
Up to $3,000,000 will be financed by the University, which will be repaid with non-state revenues
generated by MSU Athletics. The remainder of the project, approximately $15,000,000, will be
funded from external gifts (donations) to this project.
https://mus.edu/board/meetings/2019/Jul ... -R0719.pdf
Thank you for info. So does that mean about 13.5M has been raised thus far from donors and then they need another 1.5M from public to get to 15M and then will finance 3M for a total of 18M. That’s how that seemed to read but must admit it’s confusing. Earlier reports made it sound like 16.5 have been raised already but this seems to negate that.
MSU is financing up to $3 million depending on what other donations come in. I’m not sure how much has been privately raised, but it’s north of $13.5 million (13.8?) and they’re requiring $1.5 million more. So they’d already be under the $3 million ($2.7?) in financing.

By comparison, UM went to the BOR with $9 million ($7 million of which came from a single donor) and asked for up to $5 million in financing.

https://missoulian.com/news/local/regen ... 97ea1.html

Since financing is paid off by revenues from games it’s still considered private.
And they had to use all $5 million in financing.
The article quotes that $500K of the financing had been raised. I’m sure UM and MSU went into its fundraising knowing that it could finance at least that much. I think the main thing is how much is funded by the alumni/fans. Other than the last MSU project and this one by UM I don’t have anything else to compare it to, but this current project definitely stands out compared to those two. There were a lot of naysayers during the process that either didn’t think MSU fans were capable or didn’t have a good understanding of the process. This just shows what an outstanding job the fundraisers and donors did. It’s something to be proud of in recent, relative terms.
Agreed....I am hopeful that once we close this $1.5m gap, the giving will continue, so we can get that indoor practice facility built.
I think I’m just going to enjoy this for awhile.

I’d be interested in knowing if this a record amount of private donated money for a sports facility in Montana.

Re: Facilities - Coach Choate

Posted: Wed Jul 03, 2019 10:14 am
by Caturday
lutecat wrote:
Wed Jul 03, 2019 4:34 am
Caturday wrote:
Tue Jul 02, 2019 2:31 pm
Don’t forget that your donation can be pledged and paid over 5 years! 3000 people pledging $100/yr for 5 years and we’re there.
Well if that's the case $1500 over 5 years is only $21 per month. Do they bill you monthly or quarterly or what?
I’m paying my pledge with annual payments. Monthly or quarterly payments could be an option. They probably could set up a monthly charge on your credit card if that worked best for you.

It’d be awesome to see the number of contributors jump from 343 to 4000 over the next month or two.

Re: Facilities - Coach Choate

Posted: Wed Jul 03, 2019 9:26 pm
by Catfanatic84
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html

Re: Facilities - Coach Choate

Posted: Thu Jul 04, 2019 9:38 am
by Montanabob
Catfanatic84 wrote:
Wed Jul 03, 2019 9:26 pm
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
Well homecoming announcement it is.

Re: Facilities - Coach Choate

Posted: Thu Jul 04, 2019 11:19 am
by gtapp
Catfanatic84 wrote:
Wed Jul 03, 2019 9:26 pm
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
How much work can be done during winter months? Any restrictions due to temperature?

Re: Facilities - Coach Choate

Posted: Thu Jul 04, 2019 11:31 am
by TomCat88
gtapp wrote:
Thu Jul 04, 2019 11:19 am
Catfanatic84 wrote:
Wed Jul 03, 2019 9:26 pm
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
How much work can be done during winter months? Any restrictions due to temperature?
Lots. I had my house built starting in January of 2018, which was the snowiest winter in Helena history, and it got done faster than the first house, which started in April 2006. Same contractor. Not a big factor. There’s always a few days when it’s just unbearable to go outside, but nothing that’s going to cause a huge, several weeks, delay.

Re: Facilities - Coach Choate

Posted: Thu Jul 04, 2019 11:51 am
by gtapp
TomCat88 wrote:
Thu Jul 04, 2019 11:31 am
gtapp wrote:
Thu Jul 04, 2019 11:19 am
Catfanatic84 wrote:
Wed Jul 03, 2019 9:26 pm
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
How much work can be done during winter months? Any restrictions due to temperature?
Lots. I had my house built starting in January of 2018, which was the snowiest winter in Helena history, and it got done faster than the first house, which started in April 2006. Same contractor. Not a big factor. There’s always a few days when it’s just unbearable to go outside, but nothing that’s going to cause a huge, several weeks, delay.
Do concrete footings have to be done before a certain period?

Re: Facilities - Coach Choate

Posted: Thu Jul 04, 2019 12:42 pm
by TomCat88
gtapp wrote:
Thu Jul 04, 2019 11:51 am
TomCat88 wrote:
Thu Jul 04, 2019 11:31 am
gtapp wrote:
Thu Jul 04, 2019 11:19 am
Catfanatic84 wrote:
Wed Jul 03, 2019 9:26 pm
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
How much work can be done during winter months? Any restrictions due to temperature?
Lots. I had my house built starting in January of 2018, which was the snowiest winter in Helena history, and it got done faster than the first house, which started in April 2006. Same contractor. Not a big factor. There’s always a few days when it’s just unbearable to go outside, but nothing that’s going to cause a huge, several weeks, delay.
Do concrete footings have to be done before a certain period?
No. It can’t be too cold, but they can cover it and run heat tubes over it. It’s trickier, but very doable.

Re: Facilities - Coach Choate

Posted: Thu Jul 04, 2019 1:53 pm
by RickRund
TomCat88 wrote:
Thu Jul 04, 2019 12:42 pm
gtapp wrote:
Thu Jul 04, 2019 11:51 am
TomCat88 wrote:
Thu Jul 04, 2019 11:31 am
gtapp wrote:
Thu Jul 04, 2019 11:19 am
Catfanatic84 wrote:
Wed Jul 03, 2019 9:26 pm
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
How much work can be done during winter months? Any restrictions due to temperature?
Lots. I had my house built starting in January of 2018, which was the snowiest winter in Helena history, and it got done faster than the first house, which started in April 2006. Same contractor. Not a big factor. There’s always a few days when it’s just unbearable to go outside, but nothing that’s going to cause a huge, several weeks, delay.
Do concrete footings have to be done before a certain period?
No. It can’t be too cold, but they can cover it and run heat tubes over it. It’s trickier, but very doable.


Been away from that stuff for a while but they also can add an activator to the mix so it can set up quicker. With that though there is a possibility to have the mix slough if my memory serves me correctly.

JUST HURRY AND GET IT DONE!!!!! :D

Re: Facilities - Coach Choate

Posted: Thu Jul 04, 2019 11:47 pm
by luckyirishguy25
RickRund wrote:
Thu Jul 04, 2019 1:53 pm
TomCat88 wrote:
Thu Jul 04, 2019 12:42 pm
gtapp wrote:
Thu Jul 04, 2019 11:51 am
TomCat88 wrote:
Thu Jul 04, 2019 11:31 am
gtapp wrote:
Thu Jul 04, 2019 11:19 am
Catfanatic84 wrote:
Wed Jul 03, 2019 9:26 pm
Looks like the goal is to have fundraising done by October.

https://www.bozemandailychronicle.com/s ... 0ee79.html
How much work can be done during winter months? Any restrictions due to temperature?
Lots. I had my house built starting in January of 2018, which was the snowiest winter in Helena history, and it got done faster than the first house, which started in April 2006. Same contractor. Not a big factor. There’s always a few days when it’s just unbearable to go outside, but nothing that’s going to cause a huge, several weeks, delay.
Do concrete footings have to be done before a certain period?
No. It can’t be too cold, but they can cover it and run heat tubes over it. It’s trickier, but very doable.


Been away from that stuff for a while but they also can add an activator to the mix so it can set up quicker. With that though there is a possibility to have the mix slough if my memory serves me correctly.

JUST HURRY AND GET IT DONE!!!!! :D
The faster your concrete cures the weaker it is, don't need anymore roof failures.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 10:42 am
by St George
Hopefully the architectural and engineering for this phase have been completed so they can hit the ground running. Fast track design can be utilized but a little more risk involved. Contractor and labor availability can also delay things.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 12:26 pm
by Montanabob
---The faster your concrete cures the weaker it is, don't
---need anymore roof failures.

Hope they don't make it a concrete roof unless they open a patio bar up there.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 1:37 pm
by St George
Montanabob wrote:
Fri Jul 05, 2019 12:26 pm
---The faster your concrete cures the weaker it is, don't
---need anymore roof failures.

Hope they don't make it a concrete roof unless they open a patio bar up there.
If they have any sight into the future they will design the structure and infrastructure so the future levels could be added down the road.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 1:41 pm
by iaafan
St George wrote:
Fri Jul 05, 2019 10:42 am
Hopefully the architectural and engineering for this phase have been completed so they can hit the ground running. Fast track design can be utilized but a little more risk involved. Contractor and labor availability can also delay things.
You can’t do a/e until you get spending authority, which will be granted at the next BOR meeting.

Re: Facilities - Coach Choate

Posted: Fri Jul 05, 2019 1:43 pm
by iaafan
St George wrote:
Fri Jul 05, 2019 1:37 pm
Montanabob wrote:
Fri Jul 05, 2019 12:26 pm
---The faster your concrete cures the weaker it is, don't
---need anymore roof failures.

Hope they don't make it a concrete roof unless they open a patio bar up there.
If they have any sight into the future they will design the structure and infrastructure so the future levels could be added down the road.
They shouldn’t need to add levels. They do have plans way down the road to construct an adjacent building. They also have a plan to add seating in the end zone abutting the facility.