Re: Bobcat Athletic Complex...Construction
All they need done by August is the locker rooms and the coach's offices.
Play ball.
Edit.... give the BSC Officials a tent for the first game....
Play ball.
Edit.... give the BSC Officials a tent for the first game....
MSU fan.... U of I Graduate... They're Back
- thefrank1
- 2nd Team All-BobcatNation
- Posts: 1375
- Joined: Fri Dec 04, 2015 12:14 pm
- Location: Bozeman
Re: Bobcat Athletic Complex...Construction
Oh he'll, BSC officials only deserve cubicle partitions and no more.
While registering my vehicles the assessor stated "I have had both Cat and Griz students and alums work for me and the Griz end up working under the direction of the Cats."
- BleedingBLue
- Golden Bobcat
- Posts: 6187
- Joined: Mon Dec 07, 2015 1:00 pm
Re: Bobcat Athletic Complex...Construction
100% and somehow, I could be wrong, but I believe a BSC crew did a quarterfinal and semifinal game this spring!
-
- BobcatNation Hall of Famer
- Posts: 3616
- Joined: Mon Nov 21, 2011 11:35 pm
Re: Bobcat Athletic Complex...Construction
Actually, they DO need to be 100% in order to have any use of the facility (I mean, you can do paint touch ups and stuff like that after move in, but they will need a certificate of occupancy in order to move in...which signifies 100% completion).Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
But that’s warranty work, not substantial completion.
-
- BobcatNation Hall of Famer
- Posts: 3616
- Joined: Mon Nov 21, 2011 11:35 pm
Re: Bobcat Athletic Complex...Construction
Carpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
- Montanabob
- BobcatNation Hall of Famer
- Posts: 3771
- Joined: Wed Feb 22, 2012 8:29 pm
- Location: Two Dot
Re: Bobcat Athletic Complex...Construction
Depends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
MSU fan.... U of I Graduate... They're Back
-
- Golden Bobcat
- Posts: 4779
- Joined: Mon Jul 19, 2004 2:09 pm
- Location: Minneapolis, MN
Re: Bobcat Athletic Complex...Construction
Exactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
Gary Tapp
Graduated MSU 1981
Hamilton High School
Minneapolis, MN
Graduated MSU 1981
Hamilton High School
Minneapolis, MN
- Montanabob
- BobcatNation Hall of Famer
- Posts: 3771
- Joined: Wed Feb 22, 2012 8:29 pm
- Location: Two Dot
Re: Bobcat Athletic Complex...Construction
Damn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I am bottling beer at home and I need to order my yeast an extra month in advance. The growlers need too be ordered six months in advance. Or I have to drink the beer out of the copper kettle.
MSU fan.... U of I Graduate... They're Back
- RickRund
- Golden Bobcat
- Posts: 7329
- Joined: Tue Jun 22, 2010 6:08 pm
- Location: Post Falls ID
Re: Bobcat Athletic Complex...Construction
Now when written in my language I understand exactly what you mean...Montanabob wrote: ↑Wed May 12, 2021 9:15 pmDamn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I am bottling beer at home and I need to order my yeast an extra month in advance. The growlers need too be ordered six months in advance. Or I have to drink the beer out of the copper kettle.
msubobcats@outlook.com
Audiatur et altura pars: Let both sides be fairly heard.
Audi alteram partem: listen to the other side.
Audiatur et altura pars: Let both sides be fairly heard.
Audi alteram partem: listen to the other side.
- coloradocat
- Golden Bobcat
- Posts: 4885
- Joined: Sat Oct 01, 2016 8:24 pm
Re: Bobcat Athletic Complex...Construction
Please tell me you aren't using growlers to bottle your beer.Montanabob wrote: ↑Wed May 12, 2021 9:15 pmDamn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I am bottling beer at home and I need to order my yeast an extra month in advance. The growlers need too be ordered six months in advance. Or I have to drink the beer out of the copper kettle.
Eastwood, did not make it. Ball out! Recovered, by Montana State!! The Bobcats hold!!! The Bobcats hold!!!
- Montanabob
- BobcatNation Hall of Famer
- Posts: 3771
- Joined: Wed Feb 22, 2012 8:29 pm
- Location: Two Dot
Re: Bobcat Athletic Complex...Construction
Yup. It's gone in a few days.coloradocat wrote: ↑Thu May 13, 2021 9:53 pmPlease tell me you aren't using growlers to bottle your beer.Montanabob wrote: ↑Wed May 12, 2021 9:15 pmDamn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I am bottling beer at home and I need to order my yeast an extra month in advance. The growlers need too be ordered six months in advance. Or I have to drink the beer out of the copper kettle.
MSU fan.... U of I Graduate... They're Back
-
- Golden Bobcat
- Posts: 7177
- Joined: Mon May 03, 2004 12:44 pm
Re: Bobcat Athletic Complex...Construction
I'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
- catsrback76
- Golden Bobcat
- Posts: 8743
- Joined: Mon Oct 10, 2005 11:18 am
- Location: Sitting on the hill looking at the Adriatic!
Re: Bobcat Athletic Complex...Construction
Methinks that everything will be "finished" to the point of use, with touch ups coming to completion after the season starts. Just going on my own experience with projects. The Martel team don't want to miss the deadline...for any reason!iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
- Hawks86
- Golden Bobcat
- Posts: 10609
- Joined: Sat Jan 06, 2007 3:27 pm
- Location: MT
Re: Bobcat Athletic Complex...Construction
I think the "punch list" will be quite long. Not in a legal sense, but a bunch of small stuff.
Last edited by Hawks86 on Fri May 14, 2021 9:54 am, edited 1 time in total.
"I'm a Bobcat forever its in my soul..."
-
- Golden Bobcat
- Posts: 7177
- Joined: Mon May 03, 2004 12:44 pm
Re: Bobcat Athletic Complex...Construction
I agree and didn't mean to sound like I was doubting things. Martel is a top notch company and seem very dedicated to MSU, so I assume they're doing everything possible to get this done as you stated.catsrback76 wrote: ↑Fri May 14, 2021 9:49 amMethinks that everything will be "finished" to the point of use, with touch ups coming to completion after the season starts. Just going on my own experience with projects. The Martel team don't want to miss the deadline...for any reason!iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
-
- 1st Team All-BobcatNation
- Posts: 1710
- Joined: Sat Oct 09, 2010 11:26 am
- Location: Bozeman emigrant, Whitehall immigrant
Re: Bobcat Athletic Complex...Construction
Big construction companies are big for a reason. They meet their contract requirements of cost and schedule. And subs make sure they meet the contractor's needs or know they will never do work for them again and may be subject to fines.iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I will bet the BAC finishes within the contract time and cost specs.
"...get in 21 personnel and pound people and take their souls and have fun doing that..." coach Choate
- kennethnoisewater
- BobcatNation Hall of Famer
- Posts: 3674
- Joined: Wed Jul 20, 2011 12:41 pm
- Location: Kalispell, MT
Re: Bobcat Athletic Complex...Construction
Martel also knows there are more eyes on this project than probably any other construction project in the state right now, so they'll do everything in their power to get it done. If personnel is what they need, they'll pull them off other jobs. You worry about the things that are outside their control. They can throw their weight around to get moved up a priority list for supplies or subs, and hopefully that's all it'll take.catsrback76 wrote: ↑Fri May 14, 2021 9:49 amMethinks that everything will be "finished" to the point of use, with touch ups coming to completion after the season starts. Just going on my own experience with projects. The Martel team don't want to miss the deadline...for any reason!iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
- AFCAT
- Golden Bobcat
- Posts: 9395
- Joined: Mon Sep 12, 2016 3:25 pm
Re: Bobcat Athletic Complex...Construction
You would think after the third or fourth time some knucklehead has closed the blinds and blocked the BAC camera that someone would get a clue and put up a sign that reads; “Don’t close the blinds!”
QB Club https://www.msubqc.org
Bobcat Collective https://linktr.ee/thebobcatcollective
“In the military, they teach you the best time to attack your enemy is nighttime and bad weather. We’ve got f—ing both!” — Devin Slaughter
Bobcat Collective https://linktr.ee/thebobcatcollective
“In the military, they teach you the best time to attack your enemy is nighttime and bad weather. We’ve got f—ing both!” — Devin Slaughter
-
- BobcatNation Letterman
- Posts: 219
- Joined: Sun Nov 01, 2009 10:46 pm
-
- Golden Bobcat
- Posts: 4779
- Joined: Mon Jul 19, 2004 2:09 pm
- Location: Minneapolis, MN
Re: Bobcat Athletic Complex...Construction
I leave the camera up all day and check on it every couple of hours like something major is going to happen. They were moving some dirt around yesterday and I was like; OMG what are they doing? Not sure what I will do when it is all done.