100% and somehow, I could be wrong, but I believe a BSC crew did a quarterfinal and semifinal game this spring!
Actually, they DO need to be 100% in order to have any use of the facility (I mean, you can do paint touch ups and stuff like that after move in, but they will need a certificate of occupancy in order to move in...which signifies 100% completion).Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
Carpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
Depends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
Exactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
Damn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
Montanabob wrote: ↑Wed May 12, 2021 9:15 pmDamn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I am bottling beer at home and I need to order my yeast an extra month in advance. The growlers need too be ordered six months in advance. Or I have to drink the beer out of the copper kettle.
Please tell me you aren't using growlers to bottle your beer.Montanabob wrote: ↑Wed May 12, 2021 9:15 pmDamn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I am bottling beer at home and I need to order my yeast an extra month in advance. The growlers need too be ordered six months in advance. Or I have to drink the beer out of the copper kettle.
Yup. It's gone in a few days.coloradocat wrote: ↑Thu May 13, 2021 9:53 pmPlease tell me you aren't using growlers to bottle your beer.Montanabob wrote: ↑Wed May 12, 2021 9:15 pmDamn, that was to complicated for this board. Let me rephrase it for you..gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I am bottling beer at home and I need to order my yeast an extra month in advance. The growlers need too be ordered six months in advance. Or I have to drink the beer out of the copper kettle.
I'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
Methinks that everything will be "finished" to the point of use, with touch ups coming to completion after the season starts. Just going on my own experience with projects. The Martel team don't want to miss the deadline...for any reason!iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
I agree and didn't mean to sound like I was doubting things. Martel is a top notch company and seem very dedicated to MSU, so I assume they're doing everything possible to get this done as you stated.catsrback76 wrote: ↑Fri May 14, 2021 9:49 amMethinks that everything will be "finished" to the point of use, with touch ups coming to completion after the season starts. Just going on my own experience with projects. The Martel team don't want to miss the deadline...for any reason!iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
Big construction companies are big for a reason. They meet their contract requirements of cost and schedule. And subs make sure they meet the contractor's needs or know they will never do work for them again and may be subject to fines.iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.
Martel also knows there are more eyes on this project than probably any other construction project in the state right now, so they'll do everything in their power to get it done. If personnel is what they need, they'll pull them off other jobs. You worry about the things that are outside their control. They can throw their weight around to get moved up a priority list for supplies or subs, and hopefully that's all it'll take.catsrback76 wrote: ↑Fri May 14, 2021 9:49 amMethinks that everything will be "finished" to the point of use, with touch ups coming to completion after the season starts. Just going on my own experience with projects. The Martel team don't want to miss the deadline...for any reason!iaafan wrote: ↑Fri May 14, 2021 9:32 amI'm not sure how many subs are working on this, but if one of them can't do work due for whatever reason, then it can throw the whole project timeline off.gtapp wrote: ↑Wed May 12, 2021 9:12 pmExactly!! I am developing a new contrast injection device for Angiograms. Due to long lead times I am ordering my displays and all my PCBA's this week, one year in advance of when I need them. If you plan for these delays )that is, if you see them coming) you can still stay on schedule.Montanabob wrote: ↑Wed May 12, 2021 9:07 pmDepends on if if they ordered them in Jan 2021 or July 2020.onceacat wrote: ↑Wed May 12, 2021 8:39 pmCarpet, flooring, lights, plumbing fixtures are all running 4-6 weeks longer than typical. I can only imagine what specialties like lockers, desks, auditorium seats are looking at for lead times right now.AFCAT wrote: ↑Wed May 12, 2021 10:20 amHere are some completion months that MSU has posted online. Now, I don't know if these dates were wishful thinking on MSUs part or if the construction has been pushed back at all. The folks at the Alumni foundation are now targeting the middle of August, which is approximately three months away. I have my doubts about the BAC being completed by mid-August, but I'm not a part of the project (other than donating a lot of money to it) in any way. Keeping my fingers crossed though.Hawks86 wrote: ↑Wed May 12, 2021 8:04 amDon't remember them pushing the timeline. They don't have to be 100% done to be able to move in and use the facility. Wouldn't surprise me if a small crew was still there for awhile after they move in.onceacat wrote: ↑Wed May 12, 2021 7:53 amWe have pix on here from 2 weeks ago, and they were partially done hanging drywall. Zero doubt they are behind, because they’ve already pushed beck the completion date by a month.
I wouldn’t bet against them, but they are definitely going to need every last secon between now and Gold Rush.
![]()
I mean, in order to have a garage door installed at closing on a new house, you need to place the order when you break ground.
Martel could still pull it off...they are a best in class contractor.
But supply chains are such a disaster right now that it wouldn’t surprise me at all to find that critical materials were delayed into 2022.